The UAE Ministry of Energy and Infrastructure (MoEI) has announced the start of a major maintenance operation at Bridge 3 on the Sheikh Mohammed bin Zayed Road in Sharjah.
Drivers are being urged to proceed with caution as the work is carried out on the E311 from 01:00 am to 05:00 am.
They must follow the advised speed limits when in the area.
The maintenance is scheduled to continue until March 17.
The MoEI announces that maintenance works will be carried out for Bridge No. 3 on Sheikh Mohammed bin Zayed Road E311 in the Emirate of Sharjah, as of 22/02/2021 until 17/03/2021, from 1am until 5am. pic.twitter.com/W0cNzaT9M8
— وزارة الطاقة والبنية التحتية (@MOEIUAE) February 22, 2021